In addition to the flooring install, we’re tackling the hall bathroom. Well not really tackling. Porcelain isn’t very forgiving.

Bath Pano

Here’s a cheesy panorama of how bath looks. This shot was taken with the new toilet and tile installed. A great improvement over the peeling yellow lenolium and leaky small toilet that came with the house. At this point, I still needed to install the new pedestal sink, plumb in the faucet, patch my drywall destruction, re-texture the wall, and repaint. Then replace the light fixture, new towel bar, and install an new mirror.

Plumbing Rocks

The sink went in fairly easy. I had some sequencing issues. I took out the light fixture prior to installing the sink, and didn’t replace until after the sink was done. I like to think I did it just to increase the challenge. Plumbing by headlamp is romantic afterall.

At this point we have a new light fixture installed (after another set of fixtures was installed and deemed not worthy…back to Home Depot). Holes patched and painted, good as new. We are still on the search for the ‘perfect’ mirror and towel bar…and we are also planning on removing the mirrored medicine cabinet to replace it with something matching. Fun stuff.

Committed - to light fixtures

The shirt says it all.